​Standard Plans / Special Details

Standard Plans

  
  
  
  
Folder: Catch Basins and ManholesCatch Basins and Manholes5/10/2018 10:21 AM
Folder: Cattle GuardCattle Guard5/10/2018 10:21 AM
Folder: Corrugated Metal PipeCorrugated Metal Pipe5/10/2018 10:21 AM
Folder: DrivewaysDriveways5/10/2018 10:21 AM
Folder: Erosion Control and Bedding MaterialErosion Control and Bedding Material5/10/2018 10:22 AM
Folder: Expansion and Construction JointsExpansion and Construction Joints5/10/2018 10:22 AM
Folder: FencesFences5/10/2018 10:22 AM
Folder: GuardrailsGuardrails5/10/2018 10:22 AM
Folder: MailboxesMailboxes5/10/2018 10:22 AM
Folder: Object Markers, Milepost and Dead End Road InstallationsObject Markers, Milepost and Dead End Road Installations5/10/2018 10:22 AM
Folder: Portland Cement Concrete Pavement DetailsPortland Cement Concrete Pavement Details5/10/2018 10:22 AM
Folder: Public Sidewalk Curb RampsPublic Sidewalk Curb Ramps5/10/2018 10:23 AM
Folder: RC Box Culverts (Use for Headwalls and Extensions Only)RC Box Culverts (Use for Headwalls and Extensions Only)5/10/2018 10:23 AM
Folder: RC Box Culverts (Use for RCB Extensions Only)RC Box Culverts (Use for RCB Extensions Only)5/10/2018 10:23 AM
Folder: Retaining WallRetaining Wall5/10/2018 10:23 AM
Folder: Right of Way Monument and Witness PostsRight of Way Monument and Witness Posts5/10/2018 10:23 AM
Folder: Signing and Pavement MarkersSigning and Pavement Markers5/10/2018 10:23 AM
Folder: Speed Change Lane for InterstateSpeed Change Lane for Interstate5/10/2018 10:24 AM
Folder: Steel Wire Bar SupportsSteel Wire Bar Supports5/10/2018 10:24 AM
Folder: Temporary Traffic ControlTemporary Traffic Control5/10/2018 10:24 AM
Standard_Plan_Index_(June_12_2018).xlsxStandard_Plan_Index_(June_12_2018)6/12/2018 2:52 PM33 KB

Special Details

  
  
  
  
BD.2.6.4.1.01 - letterguardrailboxcul2.pdfBD.2.6.4.1.01 - letterguardrailboxcul27/27/2017 7:00 PM1878 KB
BD.2.6.4.1.02 - letterguardrailboxcul4.pdfBD.2.6.4.1.02 - letterguardrailboxcul47/27/2017 7:00 PM2342 KB
BD.2.6.4.1.03 - letterguardrailbrehab1.pdfBD.2.6.4.1.03 - letterguardrailbrehab17/27/2017 7:00 PM2915 KB
BD.2.6.4.1.04 - letterguardrailbrehab2a1.pdfBD.2.6.4.1.04 - letterguardrailbrehab2a17/27/2017 7:00 PM731 KB
BD.2.6.4.1.05 - letterguardrailbrehab2a2.pdfBD.2.6.4.1.05 - letterguardrailbrehab2a27/27/2017 7:00 PM2938 KB
BD.2.6.4.1.06 - letterguardrailflexappr.pdfBD.2.6.4.1.06 - letterguardrailflexappr7/27/2017 7:00 PM1954 KB
BD.2.6.4.1.07 - letterguardrailjer+60.pdfBD.2.6.4.1.07 - letterguardrailjer+607/27/2017 7:00 PM2859 KB
BD.2.6.4.1.08 - letterguardrailjer-60.pdfBD.2.6.4.1.08 - letterguardrailjer-607/27/2017 7:00 PM2378 KB
BD.2.6.4.1.09 - letterguardrailprec.pdfBD.2.6.4.1.09 - letterguardrailprec7/27/2017 7:00 PM2101 KB
BD.2.6.4.1.10 - letterguardrailsmountbr1.pdfBD.2.6.4.1.10 - letterguardrailsmountbr17/27/2017 7:00 PM1929 KB
BD.2.6.4.1.11 - letterguardrailsmountbr2.pdfBD.2.6.4.1.11 - letterguardrailsmountbr27/27/2017 7:00 PM2112 KB
BD.2.6.4.1.12 - letterguardrailsteeldk.pdfBD.2.6.4.1.12 - letterguardrailsteeldk7/27/2017 7:00 PM2299 KB
BD.2.6.4.1.13 - letterguardrailswparpe1.pdfBD.2.6.4.1.13 - letterguardrailswparpe17/27/2017 7:00 PM3497 KB
BD.2.6.4.1.14 - letterguardrailswparpe2.pdfBD.2.6.4.1.14 - letterguardrailswparpe27/27/2017 7:00 PM3411 KB
BD.2.6.4.1.15 - letterguardrailtimber1.pdfBD.2.6.4.1.15 - letterguardrailtimber17/27/2017 7:00 PM2184 KB
BD.2.6.4.1.16 - letterguardrailtimber2.pdfBD.2.6.4.1.16 - letterguardrailtimber27/27/2017 7:00 PM2275 KB
BD.2.6.4.1.17 - letterguardrailwask.pdfBD.2.6.4.1.17 - letterguardrailwask7/27/2017 7:00 PM2819 KB
BD.2.6.4.1.18 - letter guard rail end treatment (flared 12.5 ft) 1 of 2.pdfBD.2.6.4.1.18 - letter guard rail end treatment (flared 12.5 ft) 1 of 27/27/2017 7:00 PM2567 KB
BD.2.6.4.1.19 - letter guard rail end treatment (flared 12.5 ft) 2 of 2.pdfBD.2.6.4.1.19 - letter guard rail end treatment (flared 12.5 ft) 2 of 27/27/2017 7:00 PM2724 KB
BD.2.6.4.1.20 - letter Guard rail end treatment (flared 18.75ft) 1 of 2.pdfBD.2.6.4.1.20 - letter Guard rail end treatment (flared 18.75ft) 1 of 27/27/2017 7:00 PM2099 KB
BD.2.6.4.1.21 - letter Guard rail end treatment (flared 18.75ft) 2 of 2.pdfBD.2.6.4.1.21 - letter Guard rail end treatment (flared 18.75ft) 2 of 27/27/2017 7:00 PM2124 KB
Special Guard Rail Details - Set (letter size).pdfSpecial Guard Rail Details - Set (letter size)7/27/2017 7:01 PM42984 KB
Thumbs.dbThumbs12/14/2013 3:28 PM33 KB