Interstate-12 Widening Amite Bridge to Juban
State Project No. 454-02-0071
Livingston Parish

Status:
Construction 100% complete July, 2013.

Description:
The project consists of the widening of the mainline of I-12 from four lanes to six lanes from the eastern terminus (eastbound and westbound lanes) of the “original” I-12 Widening DB Project (see above) proceeding eastward to the Juban Road interchange.  The project consists of all or a portion of the design and construction of the following major elements:

    • Interstate-12 mainline widening;
    • 4-H Club Road overpass (LA 1032);
    • Range Avenue interchange (LA 3002);
    • Grey’s Creek bridges; and
    • Aesthetics and landscaping.

Documents:

Interstate-12 Widening Amite Bridge to JubanNotice of Intent
Interstate-12 Widening Amite Bridge to JubanProcurement Schedule

RFQ

Interstate-12 Widening Amite Bridge to JubanI-12 App C Acknowledgment of Receipt Livingston.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 App C Form E-1 Livingston Past Project Description.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 App C Form E-2 Livingston.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 App C Form L-1 Proposer s Organization Information.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 App C Form L-2 Principal Participant and Designer Certifi.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 App C Form PP Past Performance Livingston.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 App C Form Q Proposer s Question Request Livingston.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 App C Form S Safety Questionnaire Livingston.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Widening DB Project Livingston Parish RFQ, App A.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Widening DB Project Livingston Parish RFQ, App B.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Widening DB Project Livingston Parish RFQ, App C.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Widening DB Project Livingston Parish RFQ.pdf

Interstate-12 Widening Amite Bridge to JubanShort List

RFP

Interstate-12 Widening Amite Bridge to JubanI-12 Appendix A - Perf Spec Cover (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Appendix A - Project Scope (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Concept Sketch (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 ITP (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 ITP Appendix A (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 ITP Appendix B (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Part 1 - DB Agreement (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Part 2 - DB Section 100 (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Part 3 - Design Requirements Performance Specs (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Part 4 - Appendix A Cover (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Part 4 - RFP Plans Cover (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Part 5 - Engineering Data Cover (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-01 Roadway PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-05 Drainage PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-08 Geotechnical PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-20 Pavement Structure PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-24 Structures PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-32 Traffic Mgmt Plan PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-36 Public Information PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-38 Permanent Signing PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-40 Environmental PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-43 Utilities PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-47 Maintenance During Construction PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-47 MDC Attachment A - Roadside Vegetation Maintenance Standards.pdf
Interstate-12 Widening Amite Bridge to JubanI-12 PS-51 Project and Field Office PS (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Reference Docs Cover (11-20-09).pdf
Interstate-12 Widening Amite Bridge to JubanI-12 Sketch.pdf
Interstate-12 Widening Amite Bridge to JubanITP - App C Forms.pdf
Interstate-12 Widening Amite Bridge to JubanRFP ToC.pdf

Interstate-12 Widening Amite Bridge to JubanAdjusted Scores

Project Update:
Complete