Design-Build Projects
US 90 (I-49 South) Albertson’s Pkwy to Ambassador Caffery
State Project No. H.010620
Lafayette Parish
Status:
Under construction since February, 2014.
Description:
This project is a corridor improvement to US 90, LA 182, and associated frontage roads in Lafayette Parish. The northern construction Project limit is 500 feet north of the US 90/Celebrity Drive intersection. The southerly corridor construction Project limit as measured along US 90 is approximately 1,100 feet north of the US 90 / Ambassador Caffery intersection. The limit for work on LA 182 extends from LA 96 to 100 feet north of Celebrity Drive. The project includes the following:
- Upgrading a portion of US 90 in Lafayette Parish, from an existing four-lane facility to a six-lane controlled access facility that meets Interstate standards;
- Providing a system of frontage roads that provide connectivity to highways, ramps, and businesses within the Project limits;
- Minimal lowering of the existing Level of Service on all existing roadways in the Project vicinity during the Project duration;
- Providing for Project and public safety, including emergency operations;
- Providing relief and improvements for localized drainage issues;
- Considering existing and/or permitted, but not constructed, utilities during design to avoid utility conflicts and utility coordination and relocation;
- Acquiring necessary Right-of-Way; and
- Providing systematic signalization for functionality of the intersections of US 90 and the frontage road system, ramps, and Albertson’s Parkway at the new US 90 / Albertson’s Parkway interchange.
Documents:
Notice of Intent
Procurement Schedule
RFQ
I-49 RFQ (May 7 2013) (1).pdf
I-49 RFQ Addendum.pdf
I-49 RFQ App A - Project Description (May 7 2013).pdf
I-49 RFQ App B - Format Org for SOQ (May 7 2013).pdf
I-49 RFQ App C - Forms Acknowledgment of Receipt (May 7 2013).pdf
I-49 RFQ App C - Forms Cover TOC (May 7 2013).pdf
I-49 RFQ App C - Forms Form E-1 - Past Project Descriptions (May 7 2013).pdf
I-49 RFQ App C - Forms Form E-2 - Sub Info (May 7 2013).pdf
I-49 RFQ App C - Forms Form L-1 - Proposer Org Info (May 7 2013).pdf
I-49 RFQ App C - Forms Form L-2 - Principal Participant Cert (May 7 2013).pdf
I-49 RFQ App C - Forms Form PP - Past Performance (May 7 2013).pdf
I-49 RFQ App C - Forms Form Q - Questions (May 7 2013).pdf
I-49 RFQ App C - Forms Form S - Safety Questionnaire (May 7 2013).pdf
RFQ Master ToC (May 7 2013).pdf
Short List
RFP
Addendum 1.pdf
Addendum 2.pdf
Addendum 3.pdf
Addendum 4.pdf
Addendum 5.pdf
Final Appendix C - Forms Cover and TOC (9-10-13).pdf
Final ITP App A App B (9-10-13).pdf
Final ITP App C Forms.pdf
Final Part 1 - DB Agreement App A (9-10-13).pdf
Final Part 2 - DB Section 100 Cover and TOC (9-10-13).pdf
Final Part 2 - DB Section 101 (9-10-13).pdf
Final Part 2 - DB Section 102 (9-10-13).pdf
Final Part 2 - DB Section 103 (9-10-13).pdf
Final Part 2 - DB Section 104 (9-10-13).pdf
Final Part 2 - DB Section 105 (9-10-13).pdf
Final Part 2 - DB Section 106 (9-10-13).pdf
Final Part 2 - DB Section 107 (9-10-13).pdf
Final Part 2 - DB Section 108 (9-10-13).pdf
Final Part 2 - DB Section 109 (9-10-13).pdf
Final Part 2 - DB Section 111 (9-10-13).pdf
Final Part 2 - DB Section 112 (9-10-13).pdf
Final Part 2 - DB Section 113 (9-10-13).pdf
Final Part 2 - DB Section 114 (9-10-13).pdf
Final Part 2 - DB Section 115 (9-10-13).pdf
Final Part 3 - 12 Utilities PS (10-29-13).pdf
Final Part 3 - Design Requirements and Performance Specs (9-10-13).pdf
Final Part 4 - Indicative Plans Cover (9-10-13).pdf
Final Part 5 - Engineering Data (9-10-13).pdf
Final RFP Master ToC (9-10-13).pdf
Future Build Out.pdf
Project Layout.pdf
Project Update:
The substructure for Phase 1 of the new BNSF Railroad Bridge is in progress with the anticipation of girders being erected in November of this year. Activity around the Albertson Parkway intersection includes the installation of Mechanically Stabilized Earth walls which will temporarily carry US 90 mainline traffic in future phases, but ultimately become the Frontage Road on-ramp eastbound and off-ramp westbound. New drainage lines continue to be installed along the length of the frontage roads as well as State Route 182.