​Design-Build Projects

I-10 Widening (Siegen-Highland)
State Project No. 450-10-0159
East Baton Rouge Parish

Status:
Construction 100% complete February, 2014.

Description:
The project begins just southeast of the Siegen Lane interchange on Interstate-10 (I-10) in East Baton Rouge Parish and proceeds southeasterly toward the Highland Road interchange.  The starting point of this project is a tie-in to the end of the full six-lane section at Siegen Lane.  This project carries the proposed six-lane interstate section as close as possible to the Highland Road overpass.  The six-lane widened interstate section transitions back to the existing four-lane interstate section at the northwest end of the Highland Road overpass bridge approach slabs.  The project includes a dual exit ramp for eastbound traffic at the Highland Road interchange.

Documents:

US 90 Interchange at LA 85Notice of Intent
US 90 Interchange at LA 85Procurement Schedule

RFQ

US 90 Interchange at LA 85Acknowledgment of Receipt.pdf
US 90 Interchange at LA 85Form E-1 Past Project Description.pdf
US 90 Interchange at LA 85Form E-2 Subcontractor Information.pdf
US 90 Interchange at LA 85Form L-1 Proposer s Organization Information.pdf
US 90 Interchange at LA 85Form L-2 Principal Participant and Designer Certification.pdf
US 90 Interchange at LA 85Form PP Past Performance.pdf
US 90 Interchange at LA 85Form Q Proposer s Question Request.pdf
US 90 Interchange at LA 85Form S Safety Questionnaire.pdf
US 90 Interchange at LA 85I-10 Widening DB Project RFQ.pdf
US 90 Interchange at LA 85I-10 Widening RFQ, App A.pdf
US 90 Interchange at LA 85I-10 Widening RFQ, App B.pdf
US 90 Interchange at LA 85I-10 Widening RFQ, App C.pdf

US 90 Interchange at LA 85Short List

RFP

US 90 Interchange at LA 85I-10 Appendix A Reference Documents Cover (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 DB ITP (Conformed SoSP 12-09-09).pdf
US 90 Interchange at LA 85I-10 DB ITP Appendix A (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 DB ITP Appendix B (Conformed SoSP 12-03-09).pdf
US 90 Interchange at LA 85I-10 DB ITP Appendix C (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 Part 1 - DB Agreement (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 Part 2 - DB Section 100 (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 Part 3 - Appendix A - Performace Specifications.pdf
US 90 Interchange at LA 85I-10 Part 3 - Design Requirements (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 Part 4 - Appendix A Cover (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 Part 4 - SoSP Plan Cover (Conformed SoSP).pdf
US 90 Interchange at LA 85I-10 Part 5 - Appendix A Engineering Data Cover (Conformed SoSP 12-03-09).pdf
US 90 Interchange at LA 85I-10 Part 5 - Engineering Data Cover (Conformed SoSP 12-03-09).pdf
US 90 Interchange at LA 85I-10 Reference Documents Cover (Conformed SoSP).pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 1.pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 2.pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 3.pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 4.pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 5.pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 6.pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 7.pdf
US 90 Interchange at LA 85SP 450-10-0159 I-10 Widening SoSP Addendum 8.pdf

US 90 Interchange at LA 85Adjusted Scores

Project Update:
Complete