Projected Ads (projected projects to be advertised in the future)

Last updated on 11/17/2017

Projected date quarters below:

  • First Quarter: January - March
  • Second Quarter: April - June
  • Third Quarter:  July - September
  • Fourth Quarter: October - December

 

Project Number
Project Name
Project Manager
Project Description
Projected Date
Scope of Services
TBD 2 Topographic Survey Retainers Stan Ard Survey Retainer 3rd or 4th Quarter 2018 Topographic Surveys
TBD 2 SUE Services Survey Retainers?? Stan Ard Survey Retainer 3rd or 4th Quarter 2018? Sue Service Surveys
TBD 4 Right-of-Way Map Survey Retainers Joe Arretteig Survey Retainer 3rd or 4th Quarter 2018 Property Surveys and Right of Way Mapping
TBD Traffic Signal Designer Jody Colvin Staff Augmentation 4th Quarter 2017 - 2nd Quarter 2018 Traffic Signal Analysis, Creation of Traffic Signal Inventories, Construction Plans, Review of Construction Plans, and Synchro/Vistro Analysis
H.012811 Statewide DOTD RR inventory 2018-2020 William Shrewsberry Maintaing offsite web program for DOTD RR inventory 4th Quarter 2017 - 1st Quarter 2018 Staffing and website program necessary to maintain DOTD’s RR inventory, comply with Federal Railroad Administration (FRA) rules and address FRA inventory changes. Assists in Louisiana RR’s coordination.
44-12367 Weigh-In-Motion collection and monitoring Jason Chapman Engineering and Related Services 4th Quarter 2017 - 1st Quarter 2018 Data Collection and Monitoring
44-12891 Traffic Data Collection and Monitoring Jason Chapman Engineering and Related Services 4th Quarter 2017 - 1st Quarter 2018 Traffic Data Collection
H.001779 Jimmie Davis Bridge Catherine Mastin Engineering and Related Services 3rd Quarter 2018 Preliminary and Final design, geotechnical and construction engineering support
H.011310 Ford Street Extension Catherine Mastin Engineering and Related Services 4th Quarter 2018 Preliminary Design
H. 012740 I-20: Replace Five Overpasses (Lincoln) Ryan Morvant Engineering and Related Services 1st Quarter 2018 Feasibility Study, Geotechnical Services, Traffic Engineering, Preliminary and Final Design, Construction Engineering Support, and Related Services
H.000413 Cross Bayou Bridge Replacement Ryan Morvant Engineering and Related Services 1st Quarter 2018 Feasibility Study, Geotechnical Services, Traffic Engineering, Preliminary and Final Design, Construction Engineering Support and Related Services
H.001799 LA 531 Overpass Misty Evans Engineering and Related Services 1st Quarter 2018 Preliminary and Final Plans (Roadway and Bridge Design)
44-10239 Independent Assurance Lab Technician Jason Davis Lab Technician 4th Quarter 2017 Generate reports for Material Quality, Individual Lab Review and Annual Report, Proficiency Sample Report, Accreditation/Certification Report and Independent sampling, testing, dispute resolution and forensic quality 
44-10470 Project Manager for Local Road and Safety Program and Safe Routes to School to Public Places Program (2 positions) Laura Riggs Engineering and Related Services 1st Quarter 2018 Provide engineering and related services for Local Road Safety Program and Safe Routes to Public Places throughout the State of Louisiana
TBD SHSP Local Road Safety Program and Safe Routes to Public Places Program Technical Assistance and Crash Data Engineer Laura Riggs Engineering and Related Services 4th Quarter 2017 - 1st Quarter 2018 Provide engineering and technical assistance on LRSP and SRTPP program activities, project implementation and construction management
H.001344 US 190: LA 437 - US 190 BUS (Phase 1) Corey Landry Engineering and Related Services 4th Quarter 2017 - 1st Quarter 2018 GEOTECH, Preliminary and Final Plans
H.007273
Magazine St (Broadway- East Drive)
Orleans Parish
Melissa LeBas Engineering and Related Services 1st Quarter 2018 CE&I
H.007274
Magazine St. (East Drive - Nashville)
Orleans Parish
Melissa LeBas Engineering and Related Services 3rd Quarter 2018   CE&I
H.011798
Airline Park Blvd (Camphor - West Napoleon)
Melissa LeBas Engineering and Related Services 1st Quarter 2018 CE&I
H.011731 W. Esplande Bridge @ Duncan Canal Melissa LeBas Engineering and Related Services 1st Quarter 2018 ?CE&I
H.011797 Ames Blvd (WB Expy - Happy Street) Melissa LeBas Engineering and Related Services 2nd Quarter 2018 CE&I
H.011339 West Esplanade @ Homestead Traffic Signal Melissa LeBas Engineering and Related Services 2nd Quarter 2018 CE&I
TBD
Environmental Permit Retainer
Robert Lott Environmental Permit Retainer 3rd Quarter 2018 Environmental Permit Retainer
H.013143 Carbon Plant Road / Boeuf Bayou Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013141
Green Valley Rd. / Petite Pass
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013140 Eighty Arpent Rd. / Unnamed Coulee Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013093
Breithaupt Cuttoff Rd. / Rhinehart Crk
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013118 Hill Avenue / Drainage Canal Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013130
Red Cut Rd. & Charles Rawls Rd.
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013127 Britton Rd. & Herman Dickerson Rd. Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013122
Pine St. & Harrison / Collier Rd
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013137 Good Hope Rd. & Harmon Johnson Rd. Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013144
Pine Bluff Rd. & Tack Allen Rd.
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013120 Bethel Road / Slash Bayou Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013080
Mclemore Road / Bee Bayou
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013142 Ches Courville Rd. / Nicole Guidry Crk Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013163
Wadesboro Rd. / Unnamed Crk
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013199 Country Estates Dr. / St. Louis Bayou Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013098
Jim Cryer Ln. / Bayou Anacoco
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013111 Dorcheat Rd. / Caney Creek Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance
H.013081
Roundhill Rd. / Little Colewa Bayou
Gary Pentek Off-System Bridge 4th Quarter 2017 Topographic Survey, Bridge Design, and Environmental Clearance